Articlave MUGA

  • Articlave MUGA
  • Articlave MUGA

Project Overview

Project Title
Articlave MUGA

Project Brief
Installation of picnic tables / seating, cycle stands with hard / soft landscaping The laying of a new rubber surfaced kick about area with associated minor civil engineering earth works for reduced dig and installation of bitmac footpaths and perforated land drainage. Erection of 4 flood lighting columns, and associated ducting and cabling. The assembly of high fencing, associated gates and locks to define the Multi Use Games Area and general site / landscaping works consisting of the reinstatement of grassed areas.

Project Duration
Two Months

Role
Principal Contractor

Client
Coleraine Borough Council

Clients Representative
Coleraine Borough Council